SPC · Digital Tools

SPC

Monitor your process in real time and catch drift early.

SPC monitors your process with 7 control-chart types so you can separate natural variation from special causes and catch problems early.

Advantages of using it digitally

  • 7 control charts automatically; limits and Western Electric rule violations are flagged instantly.
  • Real-time monitoring and alarms — you're warned the moment drift appears.
  • Instant Cp/Cpk as data is entered; historical trend is retained.
  • No more updating spreadsheet charts or juggling scattered files.

How it works

Bring your process under statistical control — from data entry to control charts and process capability.

  1. 1

    Open the panel

    Open SPC; reach X̄-R, X̄-S, I-MR (variable) and p, np, c, u (attribute) control charts from one panel.

    SPC — Open the panel
  2. 2

    Create a chart

    Enter your company and choose the chart type; start from scratch or try ready sample data.

    SPC — Create a chart
  3. 3

    Enter the data

    Set subgroup count and size and enter the readings; add lower/upper spec limits and process capability is computed automatically too.

    SPC — Enter the data
  4. 4

    See the control chart

    The centre line and UCL/LCL control limits are computed automatically; out-of-control signals are detected with the 8 Nelson rules and marked on the chart.

    SPC — See the control chart
  5. 5

    Measure process capability

    Cp, Cpk, Pp and Ppk indices are computed with a histogram and normal curve; capable/not-capable is judged automatically and the result is exported as PDF/CSV.

    SPC — Measure process capability

Purpose

To keep the process in control, reduce variation and time interventions correctly — distinguishing over-adjustment from real drift.

Key functions

  • X̄-R, X̄-s, I-MR variable charts
  • p, np, c, u attribute charts
  • Control limits and Western Electric rule violations
  • Cp/Cpk process capability
  • Trend and alarm indicators

Benefits

  • Reduces scrap and rework
  • Prevents downtime and loss with early warning
  • Builds a data-driven decision culture

Who is it for?

Production, quality and process engineering teams.

Let's run this assessment in your team

We'll tailor and report it to your needs and roles. Let's schedule a short call.

Get in Touch
WhatsApp
GURU

Grupas Assistant

Let's offer you the right solution

+90 538 390 29 78
Hello! My name is GURU. I'm the Grupas digital assistant. I can answer your questions about our trainings, consulting services, technological solutions and digital tools. How can I help you?